Kern River No. 3 Hydroelectric Project (FERC No. 2290)
Last Updated October 28,2024
Please use this page to find out how to get involved and stay up to date. Note, use this updated link to access the North Fork Kern River Preliminary Flow Information Website.
To receive timely and direct communication from FERC regarding all filings associated with the KR3 Project (Docket No. P-2290), follow the directions to register for an “eSubscription” at https://www.ferc.gov/docs-filing/esubscription.asp.
Below are links to Project-related materials, notifications, and documentation (provided as PDFs). This page will be updated throughout the relicensing process as new materials become available or are updated.
Upcoming Meetings
No meetings at this time.
Documents
The data provided below includes large Excel datasets intended for electronic viewing only. These datasets are not formatted for printing.
- WR-1 Water Quality Study Plan
- WR-2 Hydrology Study Plan
- Hydrology data Water Years 1997-2023: UPDATED
- Excel Version: KR3_Hydrology Dataset_1997-2023.xlsx
- PDF Version: KR3_Hydrology Dataset_WY2023.pdf
- PDF version: KR3_Hydrology Dataset_1997-2021.pdf
- PDF Version: KR3_Hydrology Dataset_WY2022
- Hydrology data Water Years 1997-2023: UPDATED
- REC-1 Whitewater Boating Study Plan
- REC-2 Recreation Facilities Use Assessment Study Plan
All documents related to the KR3 Project can be found on FERC’s eLibrary using this website (Docket No. P-2290). Links to relevant documents can also be accessed below.
- SCE’s Updated Study Report Meeting
- Meeting Report Summary
- SCE’s Updated Study Report
- Cover Letter
- Updated Study Report
- Supporting Technical Memorandum
- WR-1 Water Quality Technical Memorandum
- WR-2 Hydrology Technical Memorandum
- BIO-1 Foothill Yellow-Legged Frog Technical Memorandum
- BIO-4 Benthic Macroinvertebrate Technical Memorandum
- Addendum to REC-1 Whitewater Boating Interim Technical Memorandum: Level 3 Single Slow Survey Results
- REC-1 Whitewater Boating Final Level 3: Intensive Study
- REC-2 Recreation Facilities Use Assessment Final Technical Memorandum
- REC-2 Recreation Facilities Use Assessment Camera Study Plan
- LAND-1 Road Condition Assessment Technical Memorandum
- Addendum to OPS-1 Water Conveyance Assessment Technical Memorandum: Tunnel Stability
- AES-1 Aesthetic Flow Technical Memorandum
- ANG-1 Enjoyable Angling Flows Technical Memorandum
- Draft License Application
- SCE’s Initial Study Report – Additional Response to Comments
- SCE’s Addendum to Initial Study Report (REC-1 Whitewater Boating and REC-2 Recreation Facilities Use Assessment, and OPS-1 Water Conveyance Assessment)
- SCE’s Request to File Additional Study Results (REC-1 Whitewater Boating and REC-2 Recreation Facilities Use Assessment)
- SCE’s 2023 Fish Population Monitoring Report (Current FERC License Article 411)
- SCE’s Initial Study Report (ISR) Response to Comments
- SCE’s Response to FERC’s November 9, 2023 Additional Information Request (AIR)
- SCE’s Initial Study Report (ISR) Meeting Summary
- SCE’s Initial Study Report
- Cover Letter and Distribution List
- Att. B Technical Study Plan Implementation Summary
- Att. C Revised Technical Study Plan Implementation Schedule
- Att. D WR -1 Water Quality Interim Technical Memorandum
- Att. E WR-2 Hydrology Interim Technical Memorandum
- Att. F BIO-1 Foothill Yellow-legged Frog Interim Technical Memorandum
- Att. G BIO-2 Special-Status Salamanders Technical Memorandum
- Att. H BIO-3 General Wildlife Resources Technical Memorandum
- Att. I BIO-4 Benthic Macroinvertebrate Interim Technical Memorandum
- Att. J BIO-5 Western Pond Turtle Technical Memorandum
- Att. K BIO-6 Stream Habitat Typing Technical Memorandum
- Att. L BOT-1 General Botanical Resources Technical Memorandum
- Att. M REC-1 Whitewater Boating Interim Technical Memorandum
- Att. N REC-2 Recreation Facilities Use Assessment Interim Technical Memorandum
- Att. O REC-3 Existing Recreation Facilities Condition Assessment Technical Memorandum
- Att. P CUL-1 Cultural Resource Interim Technical Memorandum
- Att. Q TRI-1 Tribal Resource Interim Technical Memorandum
- Att. R LAND-1 Road Condition Assessment Interim Technical Memorandum
- Att. S GEO-1 Erosion and Sedimentation Interim Technical Memorandum
- Att. T OPS-1 Water Conveyance Assessment Interim Technical Memorandum
- Att. U AES-1 Aesthetic Flows Interim Technical Memorandum
- Att. V ANG-1 Enjoyable Angling Flows Interim Technical Memorandum
- Att. W EJ-1 Environmental Justice Interim Technical Memorandum
- FERC’s Study Plan Determination
- FERC Revised Process Plan and Schedule (10-12-2022)
- SCE’s Revised Study Plan
- FERC’s Scoping Document 2
- SCE’s Proposed Study Plan
- SCE’s Response to Comments on FERCs Scoping Document 1
- FERC Scoping Meeting Notes
- FERC Scoping Document 1
- Notice of Intent and Pre-Application Document
- Pre-Application Document Volume I
- Pre-Application Document Volume II
- To take a virtual tour of the KR3 Project, click here for the Project Overview video.
- Project Overview Map
- Project Map Book
- Process Plan and Schedule
- FERC Revised Process Plan and Schedule, Attachment A (2-1-2024)
- 10/23/2024 - Updated Study Report Meeting
- 10/17/2023 - Initial Study Report (ISR) Meeting
- 5/26/2021 - Cultural and Tribal TWG Meeting
- 4/29/2021 -TWG Meeting
- 4/22/2021 - Cultural and Tribal TWG Meeting
- 2/18/2021 - Cultural and Tribal TWG Meeting
- 2/11/2021 - Aquatic TWG Meeting
- 2/10/2021 - Recreation and Land Use TWG Meeting
- 2/4/2021 - Terrestrial/Botanical TWG Meeting
- 12/10/2020 -Aquatic TWG Meeting
- 12/9/2020 - Terrestrial/Botanical TWG Meeting
- 12/9/2020 - Recreation and Land Use TWG Meeting
- 12/3/2020 - Cultural and Tribal TWG Meeting
- 11/5/2020 - Terrestrial/Botanical TWG Meeting
- 10/29/2020 - Aquatic TWG Meeting
- 10/29/2020 - Recreation and Land Use TWG Meeting
- 10/1/2020 - Public Open House Kick-Off Meeting
- 8/19/2020 - Informal Joint Agency Meeting
- 4/8/2020 - U.S. Fish & Wildlife Service Collaboration Meeting
- 4/1/2020 - California State Water Board Collaboration Meeting
- 3/25/2020 - California Department of Fish & Wildlife Collaboration Meeting
- 3/3/2020 - Forest Service Collaboration Meeting
Stay Informed
If you are interested in participating in the relicensing proceeding, please complete the Contact Registration Form and Project Questionnaire. This will ensure you are included on the distribution list and will receive future relicensing communications and meeting notifications.
Register online here to be notified via e-mail of new FERC filings and issuances related to the KR3 Project. If you have questions regarding this Project, please reach out to the relicensing team via the Contact Us information below or using the relicensing e-mail address: kr3@sce.com.
Technical Working Groups (TWGs) Meetings
The TWG process is open to all interested parties including public agencies, Native American tribes, and not-for-profit organizations, as well as individuals. Participants are expected to make a significant time commitment to prepare for and attend meetings, review documents, and provide technical input to SCE and its consultants on methods, analysis, and interpretation in a timely fashion. In light of this time commitment, it is expected that the TWG process will attract a relatively small number of subject matter experts. SCE also intends to continue providing information about the ongoing relicensing via this website.
Until further notice, all meetings will be held virtually via Microsoft Teams (see Links to Teams for each meeting). Meeting log-in, agendas, and other relevant materials will be posted on this website prior to the meeting.
Reference Documents
- 1991 Final License Application (FLA)
- 1993 Dissolved Oxygen Study
- 1994 Whitewater Study/Evaluation
- 1996 FERC Environmental Assessment
- 1997 Fish Monitoring Study Plan
- 1997 Fish Population Monitoring Extension Request
- 1998 Fish Population Monitoring Results (published 1999)
- 2000 Temperature Monitoring Report and 5-Year Summary Report (published 2001)
- 2002 Temperature Monitoring Report and 5-Year Summary Report (published 2003)
- 2004 Fish Population Monitoring Study Postponement
- 2006 Fish Population Monitoring Results (published 2007)
- 2011 Fish Population Monitoring Results (published 2012)
- 2016 Fish Population Monitoring Results (published 2017)
- 2016 Foothill Yellow-Legged Frog Conservation Assessment in California
Contact Us
Name | Company | Project Role | Address | Phone | |
---|---|---|---|---|---|
Wayne Allen | SCE | Principal Manager | 1515 Walnut Grove Ave. Rosemead, CA 91770 | wayne.allen@sce.com | 626-302-9741 |
Martin Ostendorf | SCE | Senior Manager | PO Box 100 54170 Mtn Spruce Road, P.O. Box 100 Big Creek, CA 93605 | martin.ostendorf@sce.com | 559-893-2033 |
Stephanie Fincher | SCE | Licensing Manager/Project Lead | 1515 Walnut Grove Ave. Rosemead, CA 91770 | stephanie.fincher@sce.com | 559-580-2424 |
Cornelio "Leo" Artienda | SCE | Hydro Licensing/Dam & Public Safety | 1515 Walnut Grove Ave. Rosemead, CA 91770 | cornelio.artienda@sce.com | 626-302-0328 |
Dan Keverline | SCE | Senior Manager-Operations and Maintenance | Kern 3 Hydro Powerhouse Kernville, CA 93238 | keverlds@sce.com | 760-376-3813 |
Quinn Emmering | FERC | Assigned Staff | quinn.emmering@ferc.gov | 202-502-6382 |