Qualifying Facilities Data and Documents
Unless otherwise noted, all of the documents on this page are in PDF format.
User's Guide for the Web-Based QF Outage Scheduling System
(Qualifying Facilities contracts with Maintenance Credit provision)
Effective Sept. 18, 2006, this document contains instructions on how to use the QF Outage Scheduling System. If you are a “firm capacity” QF whose contract provides for Maintenance Credit, you may download this PDF.
User's Guide for the Web-Based QF Outage Scheduling System
(QF contracts without Maintenance Credit provision)
Effective Sept. 18, 2006, this document contains instructions on how to use the QF Outage Scheduling System. If you are an “as-available capacity” QF, or a “firm capacity” QF whose contract does not provide for Maintenance Credit, you may download this PDF.
QF Maintenance Outage Scheduling Procedures
Dated Feb. 6, 2012, this document contains procedures for scheduling maintenance outages, applicable to most "firm capacity" QFs.
QF General Outage Scheduling Procedures
Dated Feb. 6, 2012, this document contains procedures for scheduling/reporting QF generator outages not covered under the QF Maintenance Outage Scheduling Procedures.
Qualifying Facilities Annual Status Report
Southern California Edison (SCE) updates this report to the California Public Utilities Commission (CPUC) once a year on Jan. 31. It provides general details of each QF project by technology.
Short Run Avoided Cost (SRAC) Energy Price Update for Qualifying Facilities (PDF)
This is the most recent price posting that SCE has filed with the CPUC.
Avoided Cost History (October 1996-Present)
This report is updated monthly and contains a summary of SCE's historical SRAC. This report is informational only and is NOT an official posting of the SRAC.